ResidentialLagos Mainland
Micheal Ogun Terrace Project
ClientPrivate Developer
Size4,500 sqm
Duration12 Months
RoleMain Contractor
The Engineering
Narrative
The Challenge
The site required extensive retrofitting of existing drainage systems to accommodate the new structural load without compromising neighboring foundations.
The Solution
We implemented a raft foundation system with integrated drainage channels, ensuring stability and water management were addressed simultaneously.