Mixed-UseLekki Phase 1
Belarabe Musa, Lekki Project
ClientCorporate
Size3,200 sqm
Duration18 Months
RoleDesign & Build
The Engineering
Narrative
The Challenge
High water tables in Lekki posed a significant risk to the basement integrity during the early piling stages.
The Solution
We utilized high-sulphate resistant cement and a specialized dewatering technique to cast a watertight basement shell.

Fig. 01 — Construction Phase


GorgeView Court
View Case Study