
ResidentialMagodo GRA
GorgeView Court
ClientQC Homes
Size1,800 sqm
Duration10 Months
RoleMain Contractor
The Engineering
Narrative
The Challenge
Balancing the client's desire for expansive glass facades with the need for thermal control in a tropical climate.
The Solution
We engineered deep overhangs and utilized low-emissivity glass to reduce solar gain while maintaining the aesthetic vision.

Fig. 01 — Construction Phase



Suncity Plaza
View Case Study