CommercialAlakara
Suncity Plaza
ClientInvestment Group
Size6,000 sqm
Duration20 Months
RoleStructural Consultant
The Engineering
Narrative
The Challenge
Managing logistics and material delivery in a highly congested market area without disrupting daily commerce.
The Solution
We adopted a night-shift construction schedule for heavy lifting and utilized prefabricated concrete elements to speed up on-site assembly.
Fig. 01 — Construction Phase
Micheal Ogun Terrace Project
View Case Study